part of following projects:
   
  Metsä Fibre Oy - pulp drying line
  August 2016 – today
  8/2016 - today
  Description: electrical installation of a pulp drying line and baling line
  Client: Metsä Fibre Oy / Finland (in partnership with Valmet / Finland)
  Location: Äänekoski / Finland
   
  Tata Steel Ijumiden BV - hot strip mill 2
  July 2016
  7/2016
  Description: modification of hot strip mill 2 (coiler 1&2) colission-list
  Client: Primetals Technologies / Austria; SMS group GmbH / Germany; Tata Steel Ijumiden BV / Netherlands
  Location: Velsen-Noord / Netherlands
   
  GE-General Electrics - Birr 4 (former ALSTOM)
  July 2015 – June 2016
  7/2015 - 6/2016
  Description: Erection of the Gas turbine GT36 prototype – Test Centre
  Client: GE - Switzerland  and Ansaldo Energia  former Alstom Switzerland AG
  Location: Birr / Switzerland
   
  Kronospan Burgos (Line 6)
  February 2015 – June 2015
  2/2015 – 6/2015
  Description: dismantling (relocation) of a Küsters wood board press incl. forming and finishing line.
  Client: Kronospan / Spain; Kronospan / Serbia
  Location: Burgos / Spain
   
  MDF - Hallein
  September 2014 – January 2015
  9/2014 – 1/2015
  Description: dismantling for relocation of a complete MDF- factory.
  Client: Kronoplus Technical AG, Switzerland
  Location: Hallein / Austria
   
  Rittal Haiger
  August 2014
  8/2014
  Description: Erection of an automatic high bay-warehouse (8 aisles), automated small parts storage (6 aisles) and complete boxes and pallets - conveying system.
  Client: BSS – Bohneberg / Germany; Rittal / Germany
  Location: Haiger / Germany
   
  PLEX 2
  September 2013 – July 2014
  9/2013 – 7/2014
  Description: Modification and Plant Lifetime Extension of Reactor block # 2
  Client: AREVA / Germany; OKG EON Sweden
  Location: Oskarshamn / Sweden
   
  AUDI EA – Press
  July 2013 – August 2013
  07/2013 – 08/2013
  Description: Erection of hydraulic tryout press for die manufacturing
  Client: Schuller / Germany; AUDI Germany
  Location: Ingolstadt / Germany
   
  GoCell
  September 2012 – June 2013
  09/2012 – 06/2013
  Description: Installation of the new Fibre line # 3
  Client: AMEC / Canada; SAPPI / South Africa
  Location: Ngodwana / South Africa
   
  Rossmann
  July 2012 – August 2012
  07/2012 – 08/2012
  Description: extension of the distribution Centre for a German’s chemist chain (entire control equipment and the material flow computer for a seven-aisle, double-depth high bay warehouse with pallet order picking, including automated restocking using 4 STC)
  Client: BSS Bohneberg / Germany; Rossmann / Germany
  Location: Landsberg  / Germany
   
  Hans Kohler AG Zürich
  May 2012 – June 2012
  05/2012 – 06/2012
  Description: Erection of an automatic storage and retrieval of containers, boxes and pallets with 8 automatic single Mast storages and picking station system.
  Client: Stöcklin Logistik AG / Switzerland ; Hans Kohler AG Zürich / Switzerland
  Location: Zürich / Switzerland
   
  PPM Ltd.
  November 2011
  11/2011
  Description: Documentation & dismantling of a hydraulic-tappet–production-system for relocation in China
  Client: LMT – PPM Precision Products Manuf. Ltd. Shenzhen / China
  Location: Wien / Austria
   
  FORD Craiova
  June 2011 – October 2011
  06/2011 – 10/2011
  Description: Erection of a new fully-automated under body and body framing system with more than 200 spot-welding – robotics.
  Client: TMS GmbH / Austria; FORD Romania / Romania
  Location: Craiova / Romania
   
  LMT Metallurgy
  April 2011 – May 2011
  04/2011 – 05/2011
  Description: relocation of two Induction melting furnace
  Client: LMT – Metallurgie GmbH / Austria
  Location: Steyrermühl / Austria
   
  AUDI VK2100
  December 2010 – February 2011
  12/2010 – 02/2011
  Description: Erection of hydraulic redraw press for automotive part production
  Client: Müller Weingarten / Germany; AUDI Germany
  Location: Ingolstadt / Germany
   
  NEMAK
  October 2010 – November 2010
  10/2010 – 11/2010
  Description: Documentation & dismantling of two Induction melting furnace for relocation
  Client: LMT – Metallurgie GmbH / Austria; Nemak Linz GmbH / Austria
  Location: Linz / Austria
   
  CCGT - Pego
  December 2009 – June 2010
  12/2009 – 6/2010
  Description: Erection of two 830MW single-shaft Combined Cycle gas turbines (CCGT)
  Client: Siemens / Austria; Elecgas SA Pego / Portugal
  Location: Abrantes / Portugal
   
  NEM - Mongstadt
  March 2009 – September 2009
  3/2009 – 9/2009
  Description: Erection of two waste heat boilers of a combined heat and power plant (CHP) based on a combined cycle.
  Client: NEM BV. Leiden / Netherlands; DONG Energy / Norway
  Location: Mongstad / Norway
   
  DONG Energy - Mongstad
  May 2008 – March 2009
  5/2008 – 3/2009
  Description: Erection of two GE Frame 9E - single-shaft- gas turbines each of 130MW with heat recovery units and a steam turbine.
  Client: General Electrics; DONG Energy / Norway
  Location: Mongstad / Norway
   
  Landi Suisse
  August 2007 – December 2007
  8/2007 – 12/2007
  Description: Erection of a complete automatic storage & distribution centre with automatic single mast high bay storage for 31500 pallets, transport system and picking stations system.
  Client: Solomon Automation / Switzerland; Landi Schweiz / Switzerland
  Location: Dotzigen / Switzerland
   
  CCPP - Kårstø
  October 2006 – July 2007
  10/2006 – 7/2007
  Description: Erection of a 418MW single-shaft Combined Cycle gas turbine (CCGT)
  Client: Siemens / Germany; Statoil Hydro Kårstø / Norway
  Location: Kårstø, Tysværvag / Norway
   
  MA48 Wien
  September 2006 – October 2006
  9/2006 – 10/2006
  Description: Installation of a slag processing system of thermal waste treatment
  Client: vatron - voestalpine mechatronics / Austria; MA48 Wien / Austria
  Location: Wien / Austria
   
  EDEKA Bauerngut
  March 2006 – July 2006
  3/2006 – 7/2006
  Description: Erection & installation of an automatic storage, distribution and retrieval of containers, boxes and pallets with automatic single Mast storages, picking station system and wrapping system.
  Client: Salomon Automation / Austria; EDEKA Bauerngut GmbH / Germany
  Location: Bückeburg / Germany
   
  Louisenthal
  November 2005 – March 2006
  11/2005 – 3/2006
  Description: General modification of the banknote - paper machine (paper money)
  Client: Papierfabrik Louisenthal GmbH /Germany
  Location: Gmund am Tegernsee / Germany
   
  London Heathrow T5
  April 2005 – November 2005
  4/2005 – 11/2005
  Description: London Heathrow Airport – Terminal 5: Installation of a complete fully automatic “early bag store” with the transport system and 30 automatic single mast cranes in a 30 aisle-high bay storage which can temporarily store up to 4.000 bags/luggage’s.
   
  HO-A voestalpine
  August 2003 – April 2005
  8/2003 – 4/2005
  Description: Dismantling and Rebuilding of the big “blast furnace A” in 100 days only.
  Client: voestalpine AG Linz / Austria
  Location: Linz / Austria
   
  Shandong Bohui Paper
  June 2003 – August 2003
  6/2003 – 8/2003
  Description: erection & commissioning of the paper machine 2
  Client: Voith Paper / Austria; Shandong Bohui Paper / China
  Location: Zibo, Qingdao / China
   
  CCPP - Dogalgaz Santralli
  April 2003 – June 2003
  4/2003 – 6/2003
  Description: Erection of two single-shaft Combined Cycle gas turbine (CCGT)
  Client: VA Tech Hydro / Austria; Dogalgaz Ankara / Turkey
  Location: Ankara / Turkey
   
  NEXT
  August 2002 – April 2003
  8/2002 – 4/2003
  Description: Extension of an existing storage and distribution centre with another 30 automatic single mast cranes in new high bay storages including the transport system and integration into the existing plant.
  Client: Siemens Dematic / United Kingdom; NEXT Distribution plc / Unidet Kingdom
  Location: Doncaster / United Kingdom
   
  Kras d.d. Food Industry
  August 2002
  8/2002
  Description: Erection & installation of an automatic pallet handling- and storage system with automatic single Mast cranes.
  Client: Stöcklin / Switzerland; Kras d.d. Food Industry / Croatia
  Location: Zagreb / Croatia
   
  Sauer Polymertechnik
  June 2002 – July2002
  6/2002 – 7/2002
  Description: Erection & installation and installation of three aisles and three 40m cranes in a high bay storage
  Client: Viastore / Germany; Sauer Polymertechnik / Germany
  Location: Föritz / Germany
   
  Isovolta (Isoremo)
  April 2002 - May 2002 & July 2002 – August 2002
  4/2002 - 5/2002 & 7/2002 – 8/2002
  Description: Erection & installation of impregnate channels (relocation from China)
  Client: Isovolta / Austria
  Location: Werndorf b. Graz / Austria
   
  Neusiedler Papier AG
  January 2002 - April 2002 & June 2002
  1/2002 - 4/2002 & 6/2002
  Description: Mechanical & Electrical modifications of different roller conveyors (pallet conveyors)
  Client: Hörmann Logistic / Germany; Neusiedler Papier AG / Austria
  Location: Ulmerfeld-Hausmening / Austria
   
  Glunz AG
  December 2001
  12/2001
  Description: installation of separating agent application
  Client: Simpelkamp / Germany; Glunz AG / Germany
  Location: Nettgau / Germany
   
  Wattens Papier
  November 2001 - December 2001
  11/2001 – 12/2001
  Description: modification of wet section (paper machine for cigarette paper)
  Client: Wattens Papier / Austria
  Location: Wattens / Austria
   
  Asta Elektrodraht GmbH
  October 2001
  10/2001
  Description: different modifications
  Client: Asta Elektrodraht GmbH / Austria
  Location: Oed / Austria
   
  Cartiere Burgo SPA
  September 2001
  9/2001
  Description: installation of two winders
  Client: Jagenberg / Germany; Cartiere Burgo SPA / Italy
  Location: Verzuolo / Italy
   
  Kronospan Menznau
  January 2001 - August 2001
  1/2001 – 8/2001
  Description: different modifications
  Client: Kronospan / Switzerland
  Location: Menznau / Switzerland
   
  Wacker Chemie
  September 2000 - December 2000
  9/2000 - 12/2000
  Description: errection and installation of one Gas turbine Frame 9E
  Client: GE (General Electrics) / France; Wacker Chemie / Germany
  Location: Burghausen / Germany
   
  Berlingske Dagblade
  August 2000 - September 2000
  8/2000 - 9/2000
  Description: errection and installation of newspaper conveying systems; inserting and stackers
  Client: Müller Martini / Austria; Berlingske Dagblade / Denmark
  Location: Copenhagen / Denmark
   
  Nolte GmbH
  April 2000 - August 2000
  4/2000 - 8/2000
  Description: errection and installation of a MDF line incl. all auxiliary plants
  Client: Diffenbacher / Germany; Nolte GmbH / Germany
  Location: Germersheim / Germany
   
  Csepel Müvek II
  November 1999 - April 2000
  11/1999 - 4/2000
  Description: MSR -  installation of two Gas turbines and one steam turbine (403 MW)
  Client: VA-Tech Hydro / Austria; Powergen / United Kingdom
  Location: Budapest / Hungary
   
  Kaindl
  September 1999 - November 1999
  9/1999 - 11/1999
  Description: errection and installation of a MDF line incl. all auxiliary plants
  Client: Simpelkamp / Germany; Kaindl / Austria
  Location: Salzburg / Austria
   
  GEW - Köln (HKW - Merkenich)
  April 1999 - September 1999
  4/1999 - 9/1999
  Description: MSR -  installation of a single shaft gas turbine
  Client: Elin Energieversorgung / Austria; GEW Köln
  Location: Köln - Niehl / Germany
   
  Kronospan Menznau
  January 1999 - April 1999
  1/1999 – 4/1999
  Description: errection and installation of a MDF line incl. all auxiliary plants
  Client: Kronospan / Switzerland
  Location: Menznau / Switzerland
   
  Jiangsu Golden East Paper
  December 1998 - January 1999
  12/1998 - 1/1999
  Description: errection and installation of paper roll conveyor system (2 paper machines)
  Client: Lamb / Switzerland; Jiangsu Golden East Paper / China
  Location: Dagang - Zhenjang / China
   
  Kaufland Unterkaka
  November 1998
  11/1998
  Description: Erection & installation of an automatic storage,  with automatic single mast cranes
  Client: BSS Bohneberg / Germany; Kaufland / Germany
  Location: Unterkaka / Germany
   
  Kronospan Chirk
  October 1998 - November 1998
  10/1998 - 11/1998
  Description: errection and installation of a wood board-press incl. auxiliary plants
  Client: Simpelkamp / Germany; Kronospan / United Kingdom
  Location: Chirk - Wrexham / United Kingdom
   
  Kohler Flexible Packaging
  July 1998 - September 1998
  7/1998 - 9/1998
  Description: errection and installation of laminating line for food-packaging
  Client: ER-WE-PA - Davis Standard / Germany; Kohler Flexible / South Africa
  Location: Pinetown - Durban / South Africa
   
  SCA Thatcham
  May 1998 - June 1998
  5/1998 - 6/1998
  Description: errection and installation of corrugated cardboard line
  Client: BHS - Corrugated / Germany; SCA Thatcham / United Kingdom
  Location: Newburry / United Kingdom
   
  HCE Sieger GmbH
  April 1998
  4/1998
  Description: errection and installation of corrugated cardboard line
  Client: BHS - Corrugated / Germany; HCE Sieger / Germany
  Location: Hannau / Germany
   
  Kronotex
  February 1998 - April 1998
  2/1998 - 4/1998
  Description: errection and installation of two KT- presses incl. auxiliary plants
  Client: Simpelkamp / Germany; Kronotex / Germany
  Location: Heiligengrabe / Germany
   
  Otor
  December 1997
  12/1997
  Description: errection and installation of corrugated cardboard line
  Client: BHS - Corrugated / Germany; Otor Bretagne / France
  Location: Charhaix - Finistere / France
   
  Alusiusse Singen
  December 1997
  12/1997
  Description: installation of aluminium - rollers
  Client: ER-WE-PA - Davis Standard / Germany; Alusiusse Singen / Germany
  Location: Singen / Germany
   
  Panasonic Hamburg
  October 1997 - November 1997
  10/1997 - 11/1997
  Description: Erection & installation of an automatic storage,  with automatic single mast cranes
  Client: BSS Bohneberg / Germany; Panasonic Hamburg / Germany
  Location: Hamburg / Germany
   
  Nobilia
  September 1997 - October 1997
  9/1997 - 10/1997
  Description: Erection & installation of an automatic storage,  with automatic single mast cranes
  Client: Haushahn / Germany; Nobilia / Germany
  Location: Verl / Germany
   
  Kronospan Chirk
  June 1997 - August 1997
  6/1997 - 8/1997
  Description: installation of an electrical filter
  Client: Hydro Air / Austria; Kronospan / United Kingdom
  Location: Chirk - Wrexham / United Kingdom
   
  KNP Leykam
  June 1997
  6/1997
  Description: errection and installation of a paper machine (PM11)
  Client: KNP Leykam / Austria
  Location: Gratkorn / Austria
   
  Patria Papier 
  April 1997 - May 1997
  4/1997 - 5/1997
  Description: different modifications
  Client: Patria Papier Frantschach / Austria
  Location: Frantschach / Austria
   
  Magna Eybl Durmont
  February 1997 - April 1997
  2/1997 - 4/1997
  Description: different modifications
  Client: Magna Eybl Durmont / Austria
  Location: Ebergassing / Austria
   
  Parkhaus 1
  November 1996 - January 1997
  11/1996 - 01/1997
  Description: installation of a full-automatic parkinghouse
  Client: Siemens Nürnberg  / Germany
  Location: Wien / Austria